Client

National Rail Limited

Project

Gatwick Airport Station

Type

Lighting Refurbishment

Sector

Transport - Rail

Location

Gatwick, Sussex

Contract

NEC

Year

2012

Duration

3 Months

The Brief

The works involved the modification of the existing lighting to the Over bridge and Lift Entrance Lobby lighting for the electrical services infrastructure to Gatwick Station, Gatwick Airport in West Sussex for Network Rail.

The Approach

This required the replacement of the existing fluorescent lighting systems, enhancement of the emergency lighting to achieve Network Rail requirements and modification of existing wiring.

KH Engineering Lighting Upgrade at Gatwick Airport Station
KH Engineering Lighting Upgrade at Gatwick Airport Station
KH Engineering Lighting Upgrade at Gatwick Airport Station
Swipe to view photos
The Challenges

The works could only be undertaken outside of normal station operating times usually between 01:00 hours and 05:00 each day. The works also had to interface with passenger travelling between the station and the airport.

The Delivery

Due to the location of the works to the Over bridge lighting and Lift Entrance Lobbies, careful planning was required due to the very high numbers of travelling public to ensure that minimal restrictions were created by the local work sites. The majority of the works were undertaken during periods of low passenger traffic.

The Outcome

The client and travelling public were provided with a much improved lighting scheme.